Transport for London Travel Alert at 7:25 on 3 February

Here are the reported incidents at 7:25 on 3 February for the Tube system:
EAST LONDON LINE: The line is closed to enable works to upgrade it to be part of the new London Overground network. Four replacement bus services operate.
CIRCLE LINE On Saturday 2 and Sunday 3 February, suspended throughout in both directions due to planned engineering works.
CENTRAL LINE: On Sunday 3 February, suspended between Liverpool Street and Leytonstone. Replacement buses operate between Stratford and Leytonstone. Please use alternative London Underground, London Buses and One Railway services where possible.
HAMMERSMITH & CITY LINE: On Saturday 2 and Sunday 3 February, suspended between Hammersmith and Baker Street due to planned engineering works. A limited replacement bus service operates between Shepherds Bush Green and Baker Street.
DISTRICT LINE: On Sunday 3 February, suspended between Turnham Green and Richmond due to planned engineering works. Replacement buses operate.
DISTRICT LINE: On Saturday 2 and Sunday 3 February, suspended between Edgware Road and Earls Court due to planned engineering works. Please use alternative London Buses and London Underground services.
PICCADILLY LINE: Suspended between Acton Town and Rayners Lane due to a signal failure.
DISTRICT LINE: Suspended between Ealing Broadway and Ealing Common due to signal failure.
BANK/MONUMENT COMPLEX: Reduced escalator service until further notice. Avoid changing trains at Bank/Monument
Passengers are advised to avoid changing trains at Bank/Monument, until further notice, due to ongoing escalator work which is slowing down interchange time through the station. The current work at Bank/Monument is leading to added journey times for customers changing between lines. Customers can avoid these delays by using alternative interchange routes.
BARKING STATION: No step free access until Monday 31 March inclusive due to planned lift maintenance work.
BOROUGH STATION: Reduced lift service at Borough until late 2008 for lift refurbishment work. On Mondays to Fridays between 0730 and 1100 and 1530 to 2000 the station will operate as exit only with no ticket issuing facilities. Please use nearby London Bridge or Elephant & Castle stations instead. Local bus Routes 35, 40, 133 and 343 operate between all three stations and valid LU tickets will be accepted.
CLAPHAM SOUTH STATION: Reduced escalator service until 14 March.
EUSTON UNDERGROUND STATION: On Saturday 2 and Sunday 3 February, Northern line Charing Cross branch trains will not stop at the station due to refurbishment works. Please use Bank branch services or Victoria line services from Warren Street.
HEATHROW TERMINAL 4 STATION: Travelcards and Freedom Passes are not accepted on Heathrow Connect or Heathrow Express services to or from this station. Journeys between Terminal 4 and Terminals 1, 2 and 3, only, are free of charge.
HOLLOWAY ROAD STATION: On Saturday 2 and Sunday 3 February, the station is closed for refurbishment works. Please use Highbury & Islington Station instead.
KING’S CROSS STATION: No step free access due to faulty lifts.
PICCADILLY CIRCUS STATION: Reduced escalator service until further notice.
SHEPHERDS BUSH CENTRAL LINE STATION: From Saturday 2 February until mid-October 2008, the station will be closed for major refurbishment works. A rail replacement bus service operates between Shepherds Bush and White City.
SOUTH HARROW STATION: Closed due to a local power failure.
SOUTHGATE STATION: On Saturday 2 and Sunday 3 February, the station is closed for refurbishment works. A connecting replacement bus service operates between Southgate and Arnos Grove.
WALTHAMSTOW CENTRAL: Closed due to staff shortage.
WESTMINSTER STATION: Reduced escalator until mid-February.
WILLESDEN JUNCTION STATION: No step free access to the Bakerloo line and the Euston – Watford Jct line due to a faulty lift.
WOOD GREEN STATION: A reduced escalator service until late March.

No Comments! Be The First!

Leave a Reply

You must be logged in to post a comment.