Transport for London Travel Alert for your tube travel at 9:55 on 20 January

Here are the reported incidents at 9:55 on 20 January for the Tube system:
EAST LONDON LINE: The line is closed to enable works to upgrade it to be part of the new London Overground network. Four replacement bus services operate.
CIRCLE LINE On Sunday 20 January, suspended throughout in both directions due to planned engineering works.
HAMMERSMITH & CITY LINE: On Sunday 20 January, suspended between Hammersmith and King’s Cross St. Pancras due to planned engineering works. A limited replacement bus service operates.
DISTRICT LINE: On Sunday 20 January, suspended between Edgware Road and Earls Court due to planned engineering works. Please use alternative London Buses and London Underground services.
METROPOLITAN LINE: On Sunday 20 January, suspended between Wembley Park and Northwood/Uxbridge, as well as between Baker Street and Aldgate, due to planned engineering works. Replacement buses operate, as well as additional Piccadilly line trains to/from Uxbridge. Chiltern Railways services are suspended between Marylebone and Amersham.
CENTRAL LINE: On Sunday 20 January, suspended between Liverpool Street and Leytonstone. Replacement buses operate between Stratford and Leytonstone. Please use alternative London Underground, London Buses and one Railway services where possible.
BANK/MONUMENT COMPLEX: Reduced escalator service until further notice. Avoid changing trains at Bank/Monument
Passengers are advised to avoid changing trains at Bank/Monument, until further notice, due to ongoing escalator work which is slowing down interchange time through the station. The current work at Bank/Monument is leading to added journey times for customers changing between lines. Customers can avoid these delays by using alternative interchange routes.
BARKING STATION: No step free access until Monday 31 March inclusive due to planned lift maintenance work.
BOROUGH STATION: Reduced lift service at Borough until late 2008 for lift refurbishment work. On Mondays to Fridays between 0745 and 1030 and 1600 to 1900 the station will operate as exit only with no ticket issuing facilities. Please use nearby London Bridge or Elephant & Castle stations instead. Local bus Routes 35, 40, 133 and 343 operate between all three stations and valid LU tickets will be accepted.
BRIXTON STATION: No step free access between the ticket hall and platforms due to a faulty lift.
EUSTON UNDERGROUND STATION: On Sunday 20 January, the planned engineering work on the Northern line Charing Cross branch has been cancelled and all lines will stop as normal.
HEATHROW TERMINAL 4 STATION: Travelcards and Freedom Passes are not accepted on Heathrow Connect or Heathrow Express services to or from this station. Journeys between Terminal 4 and Terminals 1, 2 and 3, only, are free of charge.
HOLLOWAY ROAD STATION: On Sunday 20 January, the station is closed for refurbishment works. Please use Highbury & Islington Station instead.
PLAISTOW STATION: Closed Due to a local power failure
SWISS COTTAGE STATION: Closed due to faulty escalators.
WOOD GREEN STATION: A reduced escalator service until late March.

No Comments! Be The First!

Leave a Reply

You must be logged in to post a comment.